Thursday, 19 March 2015

A Time lapse video of rubber crumb being installed in the greenside bunker on the 4th.

A time lapse video of rubber crumb being installed in the fairway bunker on the 9th.

Bunker Renovation On The 7th 18/3/15

Before

The guys from Ram-Track have now come in and have started laying the rubber crumb.

During

Watching Ram-Track carry out their operations.


Rubber profile after resin has set in place.

After

Finished product on 7th.

More photos & and news to come.............. 

Thursday, 5 March 2015

Greens Performance Testing 4/3/15


Prism Gauge
Using a prism gauge we accurately recorded exact height of cut. This also shows the quality of cut. (ripped or damaged blades of grass would be reflected in the prism.)  


Soil Temp
Using a probe we recorded soil temperatures. Average temperatures are 4.5 Celsius, when this rises to 8+ Celsius for a period of at least 14 days consistent growth will begin.  



Soil Profiling
Removing a cross section of the green allows us to see thatch levels of (40mm), after the wettest winter on record this is to be expected and will be reduced to (25mm) as the season progresses. Root depth is currently (100mm) A visual assessment of the soil profile looks positive.



(Assistant Greenkeeper Ben Millson & Tom Parker Apprentice Greenkeeper)

Stimping
On Wednesday afternoon we 'stimped' the 4th,9th and 13th greens. The stimpmeter readings were an average of 9ft on each of the greens, indicating a consistent putting speed across all the surfaces.    

GREEN SPEED CHART
Championship Play
Fast10' 6"
Medium Fast9' 6"
Medium8' 6"
Medium Slow7' 6"
Slow6' 6"

GREEN SPEED CHART
Regular Membership Play
Fast8' 6"
Medium Fast7' 6"
Medium6' 6"
Medium Slow5' 6"
Slow4' 6"
(Source; http://www.usga.org/course_care/articles/management/greens/It-s-Time-We-Put-the-Green-Back-in-Green-Speed/)

Tuesday, 3 March 2015

Winter Hand Mowing 3/3/15


An insight into how long and how far it takes to hand mow a third of the greens.


(First Assistant Joshua McCallum)


(Ben Millson Assistant Greenkeeper)

15th Green

Wednesday, 25 February 2015

New wacker plating technique from Jon last week!?


(Course Manager Jon Scoones & Deputy Course Manager John Quinn)

It worked!!!


14th to 15th path is now finished. 25/2/15


Complete Path



Some of the edges to the path may look a bit scruffy this time of year, when spring and summer come around all the path edges should have grown up.