Greens Performance Testing 4/3/15


Prism Gauge
Using a prism gauge we accurately recorded exact height of cut. This also shows the quality of cut. (ripped or damaged blades of grass would be reflected in the prism.)  


Soil Temp
Using a probe we recorded soil temperatures. Average temperatures are 4.5 Celsius, when this rises to 8+ Celsius for a period of at least 14 days consistent growth will begin.  



Soil Profiling
Removing a cross section of the green allows us to see thatch levels of (40mm), after the wettest winter on record this is to be expected and will be reduced to (25mm) as the season progresses. Root depth is currently (100mm) A visual assessment of the soil profile looks positive.



(Assistant Greenkeeper Ben Millson & Tom Parker Apprentice Greenkeeper)

Stimping
On Wednesday afternoon we 'stimped' the 4th,9th and 13th greens. The stimpmeter readings were an average of 9ft on each of the greens, indicating a consistent putting speed across all the surfaces.    

GREEN SPEED CHART
Championship Play
Fast10' 6"
Medium Fast9' 6"
Medium8' 6"
Medium Slow7' 6"
Slow6' 6"

GREEN SPEED CHART
Regular Membership Play
Fast8' 6"
Medium Fast7' 6"
Medium6' 6"
Medium Slow5' 6"
Slow4' 6"
(Source; http://www.usga.org/course_care/articles/management/greens/It-s-Time-We-Put-the-Green-Back-in-Green-Speed/)

Tuesday, 3 March 2015

Winter Hand Mowing 3/3/15


An insight into how long and how far it takes to hand mow a third of the greens.


(First Assistant Joshua McCallum)


(Ben Millson Assistant Greenkeeper)

15th Green

Wednesday, 25 February 2015

New wacker plating technique from Jon last week!?


(Course Manager Jon Scoones & Deputy Course Manager John Quinn)

It worked!!!


14th to 15th path is now finished. 25/2/15


Complete Path



Some of the edges to the path may look a bit scruffy this time of year, when spring and summer come around all the path edges should have grown up.


Wednesday, 18 February 2015

Bunker renovation on 4th 17/2/15

(Ben Millson Assistant Greenkeeper)

Sunny spells in the afternoon gave us a chance to get out and start work on the 4th, we are preparing the bunker bases for rubber crumb to be laid down to stop contamination from any organic matter or stones. Wacker plating the bunker bases will give a smoother surface when laying the rubber crumb.
  
Right Greenside Bunker On 4th 


A time-lapse video of the 4th bunkers being stripped of sand, astroturf and the greenstaff constructing the bunker ledge for the revetted turf and smoothing out the bunker faces and bases.

Tuesday, 17 February 2015

14th to 15th path renovation 17/2/15


(John Quinn Deputy Course Manager, Ben Millson Assistant Greenkeeper & Henry Connolly Assistant Greenkeeper)

First side of 14th to 15th path has been completed. This time we used thicker and longer boarding set deeper and filled to the top with path material, giving better access to the 15th and more aesthetically pleasing on the eye.  

(Ben Millson Assistant Greenkeeper & Tom Parker Apprentice)

14th to 15th path is now 95% complete all boards are now in, a scattering of path material needs to be thrown down and wacker platted for the final accomplished look.

Final complete photo to come...........


Monday, 16 February 2015

Bunker renovation begins!



A time-lapse video of the 7th right hand greenside bunker being stripped of sand, and then the astroturf layer and being prepared for the rubber crumb layer to be installed.